VISIT OUR PLACE

The Old Barn, Hurley Hall Barns,
Atherstone, Warwickshire, CV9 2HT

Stabilisation and Ground Modification

Our ground modification and soil stabilisation solutions improve existing site materials, reducing waste, minimising imported aggregates, and creating durable construction platforms.
Service Details

J D C delivers specialist ground modification and soil stabilisation solutions that transform unsuitable ground into a durable, engineered working platform ready for construction. By improving the engineering properties of existing site-won materials, we reduce the need for imported aggregates, minimise waste, and provide a more sustainable and cost-effective solution for our clients.

Our experienced team works across commercial, industrial, infrastructure and residential developments, delivering ground improvement solutions that meet project specifications while maintaining the highest standards of quality, safety and environmental compliance.

Our Process

  • Site preparation and trimming to formation level.
  • Accurate spreading of the specified binder using calibrated spreading equipment.
  • Controlled mixing of the binder into the in-situ soils using purpose-built stabilisation machinery.
  • Moisture conditioning where required to achieve optimum compaction.
  • Compaction using appropriate rollers to achieve the specified density.
  • Final grading using GPS-controlled equipment to deliver accurate finished levels.
  • In-situ density testing, moisture testing and plate bearing tests to verify compliance with project specifications.

Applications

Our ground modification solutions are suitable for a wide range of construction activities, including:

  • Working platforms for cranes
  • Roads and highways
  • Industrial yards and hardstanding’s
  • Commercial developments
  • Residential developments
  • Earthworks and capping improvement
  • Infrastructure and utility projects

Key benefits include:

  • Reduced excavation and disposal of unsuitable material
  • Reduced importation of quarried aggregates
  • Lower transport movements and associated carbon emissions
  • Improved bearing capacity and load distribution
  • Reduced settlement and improved long-term performance
  • Faster construction programmes
  • Significant cost savings compared with traditional dig-and-replace methods
  • Sustainable reuse of site-won materials
Why Choose J D C?

J D C combines experienced operators, modern stabilisation equipment, and GPS-controlled technology to deliver consistent, high-quality ground improvement solutions on projects of every scale. From initial assessment through to final testing and certification, our team works collaboratively with engineers and contractors to ensure every stabilisation scheme is delivered safely, efficiently and to specification.